Themed Attraction.com Forum Index Themed Attraction.com
Welcome to the official message boards for themedattraction.com.
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

 

Google
 
one of them seriously

 
This forum is locked: you cannot post, reply to, or edit topics.   This topic is locked: you cannot edit posts or make replies.    Themed Attraction.com Forum Index -> Post a project - post a resume
View previous topic :: View next topic  
Author Message
kjnlbb23



Joined: 19 Jul 2013
Posts: 47
Location: England

PostPosted: Tue Jul 23, 2013 2:51 pm    Post subject: one of them seriously Reply with quote

Subsequently, the reporter went to Hefei Friendship Hospital. According to Dr. Lee introduced the emergency department,[url=http://www.hogansitoufficiale20l3.info/]hogan outlet[/url], admitted that morning did several injured workers are squeezed, more people discharged from hospital observation, but there are three people have been admitted to hospital for treatment, one of them fractures, is surgery.
Initially clearly said that only a worker accidentally crossing the scratch,[url=http://www.hervelegerdressoutletsale2013.info/]herve leger[/url], no serious injuries, has returned to residence, which also serves as the project department released the morning of the raw material. Why press conference fiddling found three wounded in the hospital, one of them seriously, in these cases the final report of the material being clarified, one person accidentally scratched, otherwise they felt unwell for shock admission observation.
This cross-sectional Bailey beam 38 meters long, weighing hundreds of tons, the face of the test described under Reporter Shi issue, Jiang Hao made the following explanation, pilot stone blocks weighing 2.5 tons each,[url=http://www.mofa.gov.bd/fr/DoudouneMoncler.htm/]moncler[/url], a total of piling on the beam more than a dozen pieces,[url=http://www.mofa.gov.bd/it/hoganoutletit.html/]hogan outlet[/url], weighing nearly 15 tons, stacking purpose is to measure the capacity of the beam, piling up stones on the site are very common test, but construction must step.
Hospital Interview: Three hospital where a person fractures
Sudden danger: the beam tilt of mounting
Reporter investigation: suspected stress points and test the uneven stones
Yesterday, the reporter learned from the Hefei City Government Information Office, Pack River Avenue viaduct collapse accident, the Department of Engineering Test. The trial was placed in the most unfavorable conditions for, after preload bracket tilts for this test case, the collected data were analyzed and summarized in order to ensure the quality and safety are not affected. Preloading test for the bridge construction process must step test is normal. Preload in the overload test, a person accidentally scratched, otherwise they felt unwell hospitalized for shock observed.
Preloading test for the bridge construction process must step test is normal. According to the construction side of the workers, said the choice of beam segments Bailey beam assumption is taken into account the complexity of the environment, the other beam is used scaffolding to build.
Question 3: Viaduct completion of the opening date will be delayed?
Question 2: Why is the ultimate real casualty figure was only to clarify?
The incident was: more than a dozen people were inside the beam tighten bolts
Informed source, the beam is tilted and then skew, the process is almost instant, without any warning. According to the workers described the beam tilt in the buckle near the ground, sent a burst of loud even with the ground shake, and the scene is extremely dangerous.
11:00, Hefei focus Bureau and the site person in charge to reporters about the situation after another. Bureau in Hefei Pack River Avenue Viaduct project leader Jiang Hao said that from the current situation, the occurrence of beam tilt is a normal Bailey destructive testing. According to its introduction, the Pack River Road, the bustling Avenue elevated second joint cross beams beneath the bridge Bailey preload during overload test, synchronous collection of relevant technical parameters.
Question 1: Why preload test a number of workers in the construction?
Yesterday 7:30 Xu, the provincial capital including the River Avenue beneath the elevated bridge across the busy road length in the construction, Bailey beam dangerous place, weighing nearly 300 tons of Bailey beam tilted, heavy steel Liangzhao Dong serious side skew. Reporter investigation that led to the beam tilted within a dozen construction workers suffered no small surprise,[url=http://www.karenmillendressoutlet20l3.info/]karen millen[/url], six of whom went to the hospital for treatment,[url=http://www.hervelegerdressoutlet2013.info/]herve leger dress[/url], there are three people have been hospitalized, a person who needs arm fracture surgery. Official release said the destructive test is normal.
Reporters witnessed the behemoth-like beam tilt skew toward the east, the large gap between the cut-off beam tolerating freedom if they can drill. As was like an avalanche crashing tilt and skew, in part by squeezing Bailey has been severely deformed. In the beam side, a large crane was decent turns the beam on the tungsten slowly Shi crane, placed on the ground. But the reporter was informed that the beam through the tight construction workers over 20 days at 4 days before successful closure, do not want closure, the next day tilted danger, which also led to the workers more than twenty days of hard boondoggle.
This time the destructive testing has led to the original Bailey has been declared the end of the beam, will arrange for demolition and redevelopment, such a delay is bound to delay a lot of time, including the River Avenue elevated opening date of completion will be delayed?
Surgical ward on the 5th floor, the reporter found the two injured and hospitalized wounded,[url=http://www.karenmillendressoutletsale20l3.info/]karen millen dress[/url], Xu Xiaolei and Zhu Zhiqiang abrasions due to varying degrees, have received infusion therapy. According to the attending doctors, the two of them is not heavy, but they reflect the exception of dizziness and vomiting. Another called from Suqian Zhou Wu master because crush injuries, leading right elbow at fracture, is currently being surgically implanted steel treatment. Hospital Premier Lee introduced the construction side is responsible for receiving the injured persons phone call, the hospital sent an ambulance to the site, and the site has been arranged van will focus on the way to hospital injured,[url=http://www.karenmillendressoutletsale20l3.info/]karen millen[/url], culminating in Ma On Shan Road Viaduct successful transfer of these wounded.
It is understood that in the Pack River Avenue viaduct construction project,[url=http://www.louboutinpascherfemme.info/]louboutin[/url], a total of 39 joint similar to the beam, but the occurrence of tilt is the last construction project the beam length,[url=http://hoganscarpeoutlet2013.tumblr.com]hogan scarpe[/url], also the last time overload preload test, had never happened this condition.
According to the focus Bureau, responsible person, the incident is scheduled plan, everything within a predetermined period, to be arranged immediately after the demolition of reconstruction,[url=http://www.mofa.gov.bd/en/karenmillenoutlet.html/]karen millen[/url], will be pre-pressure test,[url=http://www.hervelegerdressoutletsale2013.info/]herve leger dress[/url], the next step to ensure elevated pouring concrete box girder construction safety.
Reporter enter the construction site,[url=http://www.louboutinpascherhomme.info/]christian louboutin[/url], they found that the normal construction site is in full swing, the occurrence of a dangerous situation, Bailey beam is a length of the bridge across the busy north-south road beneath the longitudinal beam, Bailey frame pieces are assembled into a truss , mostly made between the beam window as a connecting member bolted to live.
Giant experiment has been stacked stones at night in the beam, then this has been identified as destructive testing process, why there will be a worker desperate rush to work every day is the construction side of the negligence or simply do not realize that test After the ending?
Hefei focus Deputy Secretary Zhang Jiaxiang introduction, the tilt may be due to experimental rock dumps wrong about. Because of the lot more complex environment, the bridge is the bustling Avenue beneath the bridge, during the test, the need to build load-bearing basis, but is actually relatively long span beam.
After a lucky escape and wounded repeat, all agreed that, although heard preload test, but the day has more than ten workers in the beam within the normal construction, their mission is simple: Tighten bolts to fix Bailey beam .
Official Release: This is a normal destructive testing
In the stacked stones trial process, because of mechanical construction, these stones may be asymmetrical stacked, resulting in stress points is too concentrated,[url=http://www.karenmillendressoutletuk20l3.info/]karen millen[/url], can not guarantee balance beam pressure is applied, resulting in preload bracket tilted.
At that time there were still ten in the beam at the construction workers, mainly tighten bolts to secure the beam. One witness said the guards in this tilt after the incident, one after another, many workers from the cracks in drilled, has scared breathing heavily,[url=http://www.hervelegerdressoutletuk2013.info/]herve leger dress[/url], after which the workers together, began to count people.
Ma Qin-Qin Zhang Min Liu Chee Tsui Reporter sweet / Wen Huang Yang Yang / map
Even the real casualty figures initially reported the incident focus Bureau staff are unaware of the number of injured was the construction side deliberately concealed or a novelty? Ultimate focus Bureau said the number of casualties but also on the construction side and further investigation and verification.
相关的主题文章:


[url=http://share.phpweb2.net/news/html/?89684.html]and delete all associated with each photo[/url]

[url=http://www2e.biglobe.ne.jp/~isizaka/bbs/light.cgi?res=1024]faux billets imprimés inefficace[/url]

[url=http://www.nrdao.cn/plus/view.php?aid=6471]Liu Chunpeng[/url]
Back to top
View user's profile Send private message Visit poster's website
Display posts from previous:   
This forum is locked: you cannot post, reply to, or edit topics.   This topic is locked: you cannot edit posts or make replies.    Themed Attraction.com Forum Index -> Post a project - post a resume All times are GMT - 4 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © 2001, 2005 phpBB Group